逍遥阁茶楼_一品夜茶论坛_深圳东莞sn论坛

Bookmark this site SitemapContact Yixin  中文

Welcome toAnqiu Yixin Machinery Co., Ltd.Official website!

Yixin Machinery

Anqiu Yixin Machinery Co., Ltd.Constantly innovating and committed toproduct development, update and improvement

Service Line:15866407777

Popular Keywords: S-L separation KuangShanXiXuan
Current Position Index > 新闻中心> Briefly describe the installation operation of the drum vacu

Briefly describe the installation operation of the drum vacu

Pageviews:1551?? Release Date:2021-07-31

(1) Level the rack, frame and frame at the same time, place the rack in place, and connect the racks according to the instructions in the manual. After the level is corrected, the rack should be securely fastened.

 

(2) The tape roller, the roller supporting the tape is fixed on the frame, and after leveling, the rubber filter tape is spread on the roller. The driving roller and the driven roller are hoisted to the middle, that is, the middle of the rubber filter, and then moved to the two ends, respectively, and the bracket and the bearing seat are installed.

 

(3) Assembling and seating the vacuum box components, connecting the vacuum boxes in sequence, and aligning them with the small rollers, the lifting mechanism, the winch frame, etc., and tightening the frame and the frame with bolts. .

 

(4) Install the feeding device, the washing device small roller, the filter cloth tensioning device, the filter cloth adjusting device, and the scraping device.

 

(5) Install the connecting hose, and require tight connection without leakage.

 

(6) Drive the device, position the drive frame, install the reducer and the coupling, and ensure the coaxiality between the drive roller and the motor shaft.

 

(7) The pneumatic system, air control and deflection cylinder are connected by high pressure hose.

 

(8) Piping system, joint feeding, washing, cleaning and vacuum system piping.

 

(9) Electronic control system, connecting electric control cabinet and drive motor, gas control cabinet, joint and pipeline valve.

 

(10) Filter cloth, place the gravity roller of the filter cloth in the loosest position of the filter cloth, find the arrow of the movement direction of the filter cloth, and then pass the filter cloth through the feeding box, the washing box, the driving roller, the filter cloth gravity and the deviation Roller, roller, etc., flatten it, butt the two ends of the filter cloth and thread the wire. Check the flushing line before installing the filter cloth to ensure that all nozzles can flush the net filter cloth.

 

上一篇:没有了

下一篇:Safety requirements for vacuum drum filters

  • TELTEL15866407777
  • ContactContactManager Hao
  • 邮箱邮箱
  • Company AddressCompany AddressMinghu North Road, Anqiu Economic Development Zone, Weifang City, Shandong Province
Anqiu Yixin Machinery Co., Ltd. 备案号:鲁ICP备19026764号-1   
主站蜘蛛池模板: 基隆市| 沂源县| 永修县| 蓬莱市| 读书| 伊宁市| 合江县| 霍州市| 岱山县| 凭祥市| 新干县| 江达县| 米易县| 黑山县| 永登县| 乌恰县| 百色市| 盐津县| 晴隆县| 上林县| 杨浦区| 株洲市| 临邑县| 齐齐哈尔市| 耒阳市| 德昌县| 乌拉特后旗| 榆树市| 黄浦区| 开江县| 安泽县| 北宁市| 甘肃省| 泰和县| 怀来县| 安顺市| 邵武市| 凤庆县| 司法| 平和县| 广汉市|